The General Company for Electric Energy Transmission in the southern region announced the completion of connecting two transformers to the control and monitoring system (SCADA) at the new Bab Al-Zubair station in Basra province. The company explained that the work involved linking the fourth and fifth transformers with the control room at the station, as part of efforts to develop infrastructure and enhance the operational efficiency of the power transmission network in the province. Technical teams in North Basra networks carried out these tasks in cooperation with the Directorate of Communications and Information Transmission, enabling real-time monitoring of the transformers' operational indicators and facilitating rapid fault diagnosis and emergency response. The new Bab Al-Zubair station is a vital facility that contributes to supplying most areas of Basra city center, and this development is expected to improve the network's reliability and the stability of power supply.