The General Traffic Directorate announced on Thursday the commencement of maintenance and rehabilitation work on the Nidaa overpass, with traffic being diverted to the second side of Mohammed Al-Qasim Road for a duration of 30 days. The directorate clarified that the work is coordinated with the Projects Department at Baghdad Municipality, covering the road from the Ministry of Finance towards 600, with the alternative route set on the second side of the Mohammed Al-Qasim highway, operating in both directions during the execution period. The directorate urged all to adhere to the designated traffic diversions and alternative routes, as well as to follow the instructions of traffic officers and on-site guidance to avoid congestion, ensure the safety of citizens and workers, and maintain smooth traffic flow. It was noted that these efforts are part of ongoing initiatives to improve road conditions and reduce traffic density in the area.